LEESBURG, FL
Energy-savings solutions we implemented for this medical center will fund themselves through reduced costs and generate positive cash flow over the life of the systems.
For this surgery center, we overhauled the mechanical system with a web-enabled energy management system, lowering natural gas usage by over 62 percent and electrical consumption by 32 percent.
For this 450-person call center, we upgraded systems and controls to reduce humidity and save more than $70,000 a year in utility costs.
We fast-tracked installation of a new condenser unit, direct expansion coils, and control system to resolve comfort and efficiency issues throughout a 17,179-square-foot surgery center.
For New Vision Eye Center, we upgraded their mechanical and control systems, implementing advanced energy control strategies to have save money and increase facility comfort.
Our design-assist expertise helped a major hospital reconfigure their central energy plant to achieve optimal efficiency and millions of dollars in savings over the 20-year systems life cycle.